text/microsoft-resx 1.3 System.Resources.ResXResourceReader, System.Windows.Forms, Version=2.0.3500.0, Culture=neutral, PublicKeyToken=b77a5c561934e089 System.Resources.ResXResourceWriter, System.Windows.Forms, Version=2.0.3500.0, Culture=neutral, PublicKeyToken=b77a5c561934e089 DCMI Platform Username Password Remember me for 7 days Login Incorrect username or password! Home Project Schedule Quality HSE Welding Change Document Site Video TestRun Messages Personal Settings Logout Home Safety Statistics Safe Work Hours Safety Inspection Total Inspections (units) Closed Inspections (units) Unclosed Inspections (units) Warning Information Qualification Warning Certificate Warning Mechanical Warning Quality Warning Output Statistics Project Overview Project Name: Project Location: Project Cost: Construction Unit: Contractor Unit: Supervision Unit: Contract Duration Contract End Date Days Remaining Until Completion Quality Statistics Total Issues Completed Uncompleted Rectification Rate Qualified Rate First Pass Rate Smart Progress Project Schedule Plan Labor Data (Cumulative) Current Onsite Personnel Total Workers Total Managers Video Monitoring Environmental Monitoring Temperature Weather Condition Home Page First Pass Rate Total Number of Welders By Dyne Amount By Weld Joint Count Project Welding Engineering Quantity Statistics Welding Progress Analysis (in 10,000) Welding First Pass Rate Daily Effectiveness Analysis Unit: % Unit: People Unit: Ten Thousand Installation Components Component Code Component Name Remarks Query New Records per page: Installation Components Edit Delete View Delete selected row? Edit Installation Components Save Close Import Installation Components Audit Import Submit Download Template Select file to import Medium Definition View Installation Components Welding Consumables Consumables Code Consumables Name Steel Format Consumables Type Steel Type Welding Consumables Edit Welding Consumables View Welding Consumables DN Compare Nominal Diameter Inch Value DN Compare Edit DN Compare View DN Compare Detection Rate Detection Rate Code Detection Rate Value Detection Rate Detection Rate Edit Detection Rate Detection Rate (%) View Detection Rate Format Format Code Format Name Format Edit Format Definition View Format Definition Groove Type Groove Code Groove Name Groove Type Edit Groove Type View Groove Type Welding Material Manufacturer Manufacturer Code Manufacturer Name Remarks Welding Material Manufacturer Edit Welding Material Manufacturer Unit Code Unit Name Material Definition Material Code Material Name Material Definition Edit Material Definition Material Name Is This Project Material Type Definition Material Type Code Material Type Name Material Type Definition Edit Material Type Definition View Material Definition Medium Definition Medium Code Medium Description Edit Medium Definition Import Pipe Medium Select file to import Submit Medium Name Medium State View Medium Definition Piping Class Piping Class Code Piping Class Name Piping Class Piping Class Edit Piping Class Import Piping Class P NO. Pressure Types Pressure Code Pressure Name Pressure Types P NO. Edit Piping Class Piping Class Code Piping Class Name Piping Class Remarks Save Close Pressure Piping Class Definition Pressure Piping Class Code Pressure Piping Type Pressure Piping Class Definition Edit Pressure Piping Class View Pressure Piping Class View Pressure Type Purge Method Definition Purge Method Code Purge Method Name Purge Method Definition Edit Purge Method View Purge Method Temperature Settings Temperature Type Temperature Settings Edit Temperature Setting View Temperature Setting Testing Types Testing Type Code Testing Type Corresponding System Type Testing Type Description Safety Distance Injury Degree Testing Types Edit Testing Type View Testing Type Medium Definition Edit Medium View Medium Weld Types Weld Type Code Weld Type Name Weld Types Edit Weld Type Welding Locations Welding Location Code Welding Location Name Welding Locations Edit Welding Location Welding Methods Welding Method Code Welding Method Name Welding Methods Edit Welding Method View Welding Method View Weld Type Remark Close Check Order Audit By Month By Number Check Unit Check Order Node Tree Check Order Entry Audit Cancel Audit Cancel Audit Print Report Print Print NDT Order Number Construction Unit Facility Document Type Document Creator Document Date NDT Date Auditor Audit Date Inspector Inspection Unit Corresponding Entrustment Order RT Check Order Entry Non-RT Check Order Entry Serial Number Pipeline Number Weld Number Inspection Method Welder Number Weld Specification Film Date Report Date Repair Location Total Film Count Pass Film Count Inspection Result Film Specification Inspection Report Number Joint Count Defect Length Defect Definition Extended Meters (cm) Check Order Audit Audit Cancel Audit Print Find Trust Order Sure Search Inspection Unit Construction Area Trust Order Number Edit Import Information Unit Code Work Area Code Pipeline Code Weld Code Material 1 Code Material 2 Code Material 1 Material 2 Inspection Rate Code Welding Area Weld Property Dyne Number Specification (mm) Wall Thickness Test Pressure Weld Rod Code Weld Wire Code Single Line Drawing Number Design Pressure Design Temperature Groove Code Pipeline Level Code Component 1 Code Component 2 Code Heat Batch 1 Code Heat Batch 2 Code Belonging Section Preheat Temperature Heat Treatment Required Heat Treatment Number Welding Position Outer Diameter Hardness Test Ratio Welding Gas Protection Component Quantity Nominal Diameter Non-Standard Wall Plate Number Extended Meters Pipeline Length Batch Modification Error Information Save Pipeline Weld Joint Import Data File Please upload an EXCEL format file Upload Update Import Save Refresh Delete Duplicate Joints Delete duplicate joints in the same pipeline section? Delete Records Delete all temporary import records for the current user? Export Template Download Import Instructions Data Import Serial No. Row No. Unit Code Work Area No. Pipeline Code Weld Joint Code Material Type Code Material 1 Code Material 2 Code Material 1 Material 2 NDT Ratio Code Weld Type Code Welding Area Weld Joint Attribute Da Factor Specification Wall Thickness Welding Method Code Test Pressure Welding Rod Code Welding Wire Code Medium Code Single Line Drawing No. Design Pressure Design Temperature Groove Code Pipeline Grade Code Component 1 Code Component 2 Code Heat No. 1 Heat No. 2 Belonging Pipe Section Preheat Temperature Heat Treatment? Heat Treatment No. Welding Position Outside Diameter Hardness Test Ratio (Numeric) Welding Gas Protection Component Quantity Nominal Diameter Non-Standard? Plate No. Extended Meters Pipeline Length Error Record Count Edit Delete Delete selected row? Hardness Commission Audit Month Hardness Commission Audit Commission Unit Installation Name Commission No. Testing Unit Commissioner Commission Date Testing Method Testing Ratio Execution Standards Inspection Record No. Number of Qualified Weld Joints Number of Commissioned Weld Joints Recipient Testing Time Factory Prefabricated Weld Joints Construction Weld Joints Hardness Commission Audit Welder Code Pipe No. Weld Joint No. Specification (mm) Material Single Line Drawing No. Remarks JOT_ID Hardness Commission Entry Hardness Commission Entry Add Search Delete Confirm to delete this hardness commission? Hardness Commission Entry Search Pipeline and Weld Joints Delete Delete selected row? Search Pipeline Weld Joints Pipeline Code Confirm Left Panel Heat Treatment Center Panel Weld Joints Heat Treatment Management (By Pipeline) Pipeline No. Heat Treatment Management (By Pipeline) Confirm to delete this heat treatment? Unit Heat Treatment Report No. Heat Treatment Date Heat Treatment Method Heat Treatment Equipment Preparer Heat Treatment Management Material Code Weld Joint Specification Temperature Measurement Point No. Heat Treatment Temperature (Required) °C Heat Treatment Temperature (Actual) °C Holding Time (Required) h Holding Time (Actual) h Record Chart No. Hardness Inspection Report No. Heat Treatment Management Installation Name Number of Measurement Points Sequence No. Pipeline No. Weld No. Material Temperature Point No. Required Heat Treatment Temperature (℃) Actual Heat Treatment Temperature (℃) Required Holding Time (h) Actual Holding Time (h) Record Curve No. Hardness Test Report No. JOT_ID Add Delete Confirm to delete this heat treatment? Search weld information Delete heat treatment Save heat treatment Delete selected row? Heat Treatment Pipeline Weld Search Construction Area Confirm Left Panel Pipeline Center Panel Welds Weld Date Search Confirm Electrode Bake Record Electrode Bake Record Model Consumables Code Batch Code Inbound Code Specifications (mm) Quantity (kg) Oven Power-On Time Hrs Mins Temperature (°C) Constant Temperature (°C) Constant Start Time Hrs Mins Constant End Time Hrs Mins Time Moved into Insulation Box Hrs Mins Temperature (°C) Bake Supervisor Compilation Date Compiled By Add Import Confirm to delete this electrode bake record? Edit Code Start Time End Time Add Import Delete electrode bake record Edit Delete Electrode Bake Record Project Name Bake Date Compilation Date Electrode Bake Record (Double-click to Edit) Card Code Inbound Self Code Bake Number Delete Add New Data Delete Selected Row Download Template Select File to Import Note: 1. The import template must be an .xls Excel file, with bold text as required fields. 2. Types and projects must match the names in the base information; otherwise, they cannot be imported. 3. If you need to modify existing information, please do so in the system. 4. After data audit, click "Save" to complete the import. Batch Code Inbound Self Code System Code Review Document Code Weld Material Grade Specifications and Model Construction Unit Bake Quantity (kg) Inventory Quantity (kg) Oven Power-On Time Power-On Temperature (°C) Constant Start Time Constant End Time Constant Temperature (°C) Time Moved into Insulation Box Insulation Temperature (°C) Bake Supervisor Electrode Issuance and Recovery Record Batch Audit Export Sequence No. Code Welder Code Name Construction Unit Work Area Name Used Pipeline, Structure, Equipment Welding Method Issued Quantity Issue Date Auditor Issuer Confirm to delete this electrode issuance and recovery record? Batch audit electrode issuance and recovery records Edit electrode issuance and recovery record Delete selected row? Records per page: Electrode Issuance and Recovery Record Project Name Work Area Name Work Area Code/Professional Name Used Steel Structure, Equipment Code, Pipe Number Base Material Consumables Specifications Recovery Quantity Application Date Recovery Date Recovery Man Batch Audit for Electrode Issuance and Recovery Close Electrode Issuance Record Construction Unit Issuance Date Bake Batch Compiler Compile Date Add New Data Delete Selected Row Consumables Code Recipients Count (Roots) Electrode Issuance and Recovery Record Recovery Date Work Area Code/Professional Name Recovery Count (Jin) Electrode Issuance and Recovery Record Issuance and Recovery Date Auditor Electrode Secondary Bake Record Import Confirm to delete this electrode secondary bake record? In-Library Code Quantity (kg) Oven Power On - Hours Oven Power On - Minutes Oven Power On - Temperature (°C) Constant Temperature - Temperature (°C) Constant Temperature - Start Time - Hours Constant Temperature - Start Time - Minutes Constant Temperature - End Time - Hours Constant Temperature - End Time - Minutes Move into Insulation Box - Time - Hours Move into Insulation Box - Time - Minutes Move into Insulation Box - Temperature (°C) Compile Date Compiler Electrode Secondary Bake Record Edit Model Consumables Code In-Library Code Specifications (mm) Quantity (kg) Oven Power On Time Oven Power On Temperature (°C) Constant Temperature Start Time Constant Temperature End Time Move into Insulation Box Time Insulation Box Temperature (°C) Electrode Secondary Bake Record Import Add Data Select File to Import Delete Instructions: 1. The import template is an .xls Excel file, with required fields in bold. 2. Types and projects must match the names in the base information; otherwise, they cannot be imported. 3. To modify existing information, please edit it in the system. 4. After data audit, click "Save" to complete the import. Material Arrival Registration Record Confirm to delete this material arrival registration and acceptance record? Material Certificate Code Consumables Name Specifications Model Special Instructions Arrival Quantity (kg) Material Batch Code Manufacturer Theoretical Unit Weight Actual Arrival Weight Outbound Voucher Outbound Price (Yuan) Supply Channel Material Arrival Registration Edit Supplier Unit Waybill or Vehicle Number Delivery Person Registration Date Material Name Model Unit Quantity Accompanying Documents and Code Inspection Record Material Arrival Registration Edit System Code Specifications Model Material Consumables Code Special Instructions Arrival Quantity (kg) Manufacturer Theoretical Unit Weight (kg/m) Actual Arrival Weight (tons) Outbound Voucher Outbound Price (Yuan) Supply Channel Material Arrival Registration Record Party A Code Technical Condition Name Standard Specification Arrival Quantity Four Location Code Theoretical Unit Weight Actual Arrival Weight Outbound Price Audit Personnel Information Import Personnel Information Statistics Consumables Name Baking Second Baking Issued Recovered Inventory Delete selected row? Welding Consumables Purchase Order Name Query New Applicant Unit Purchase Order Code Purchase Order Name Date Description Applicant Status View Pipeline Material Application Purchase Order Edit Submit Applicant Unit Date Description Primary Key Material Code Location Number Material Description Unit Design Quantity Remaining Quantity This Purchase Quantity Total Purchase Quantity Size 1 Size 2 Handling Step Handler Agree? My Opinion Handling Type Handler Handling Date Handling Idea Instructions: 1. The import template is an .xls Excel file, with required fields in bold. 2. To modify existing information, please edit it in the system. 3. After data audit, click "Save" to complete the import. Welder Material Requisition Form Welder Code ID Number On Duty? Name Welder Class Photo Installation Name Structural Steel, Equipment Code, Pipeline Number Welding Method Welding Material Consumable Brand Consumable Specification Quantity (pieces) Print Material Requisition Form Print Preview Page Setup Print Setup Welding Material Requisition Form Requisition Unit: Installation Unit Code/Professional Name Welder Photo Mother Material Type Mother Material Specification Consumable Brand Welder Name Consumable Specification Quantity Approver Usage Date Non-destructive Testing Personnel Registration Form Serial Number Code Name Certificate Number Project Qualification Code Level Validity Period Validity Period Attachment Edit Delete Attachments Edit Non-destructive Testing Personnel Registration RT Qualified Level Validity PT Qualified Level Validity UT Qualified Level Validity ID Card Number MT Qualified Level Validity TOFD Qualified Level Validity Material Analysis Qualified Level Validity ID Card Number Material Mechanics Qualified Level Validity ID Card Number Attachments: Attachments Attachments Welder Entry Management Person Management Query Unit Welder Name Welder Code ID Card Number Work Code Qualified Equipment Applied Equipment Attachments Edit Welder Entry Management Edit Welder Entry Management Edit Welder Entry Management ID Card Number Work Code Qualified Equipment Validity Period Applied Equipment Examination Result Audit Agree Welder Code Transfer to Professional Engineer Audit by Professional Engineer Submit Agree Disagree Welder Information Welding Material Material Name Material Code Steel Type Min Wall Thickness Max Wall Thickness Min Size Max Size Remark Welding Method Welding Method Method Code Welding Method Method Code Person Management Team Group Welder Class Unit Team Group Gender Birthday Work Code Welder Class On Guard Qualified Projects Qualification Conditions Welding Performance Person Management Qualified Projects Qualification Conditions Welding Performance Edit Person Management Birthday Gender On Guard Welder Type Material Category Qualified Project Code Upload Photo Welder Qualification Certificate Male Female Pipe Equipment Unlimited View Person Management Qualified Projects Qualified Projects 0 means unlimited. Please copy the following characters for weldable steel types to ensure system recognition: Ⅰ, Ⅱ, Ⅲ, Ⅳ, Ni, Ti Qualified Project Code Validity Period GTAW Max Thickness (mm) SMAW Max Thickness (mm) Minimum Diameter (mm) Edit Qualified Project GTAW Max Thickness (mm) SMAW Max Thickness (mm) Minimum Diameter (mm) Welding Performance Welding Performance Project Name Unit Name Name Total Weld Joints Qualified Weld Joints Welding Range Edit Welding Performance Unit Name Total Weld Joints Qualified Weld Joints Welding Range Audit Repair Order By Month By Order Number Enter search criteria Repair Order Node Tree Order Number Pressure Client Unit Welding Method Order Date Inspection Ratio Order Type Worker ID Inspection Method Client Contact Item Name Inspection Criteria Bevel Type Inspection Request Date Acceptance Grade Medium Temperature Repair Order Entry Serial No. Pipe Number Joint Code Outer Diameter Wall Thickness Welding Area Welding Method Joint Specification Cut Status Remarks Repair Order Entry Confirm deletion of this repair order? Client Unit Search Pipe and Joint Print Delete Search Pipe and Joint Information Pipe Number Confirm Inspection Joint Information Joint Type Inspection Ratio Select Joints for Expansion Default to Same Pipe Same Welder A-Item End Work Entry Month A-Item End Work Node Tree Save A-Item End Work Entry Inspection Date Handler Handling Date A-Item Content A-Item End Work Entry A-Item Content Inspector Inspection Date Handler Handling Date B-Item End Work Entry Page B-Item End Work Node Tree Save B-Item End Work Entry B-Item Content B-Item End Work Entry B-Item Content View Joint Information Joint Information Joint Code Welded Joint Status Trust Status NDT Status Joint Attribute Weld Date Cover Welder Base Welder Search Pipes and Joints Pipe Code Area Pipes Single Line Number Specification Design Pressure Design Temperature Test Pressure Test Temperature NDT Class Medium Test Package Audit Test Package Node Tree Audit Cancel Audit Tightness Test Time Tightness Test Pressure Test Package No. Modifier Modification Date Leakage Test Medium Test Package Code System Name Tightness Test Temperature Leakage Test Pressure Test Medium Operating Medium Purging Medium Cleaning Medium Test Type Test Heat Test Ambient Temperature Test Medium Temperature Allowed Seepage Actual Seepage Vacuum Test Pressure Vacuum Test Medium Hydrostatic Test Temperature Hydrostatic Test Pressure Hydrostatic Test Time Recorder Recording Date Auditor Audit Date Test Package Audit Total Welds Completed Welds Qualified Count Unqualified Count Required Detection Ratio Actual Detection Ratio (Welded) Actual Detection Ratio (Socket) ISO_ID Not Welded Welded, Not Detected Welded, Detected, Unqualified Passed View Joint Information Test Package Entry Add Search Pipe Information Delete Test Package Confirm deletion of this test package? Save Test Package Modifier Test Type Test Pressure Recorder Test Package Entry Find Pipe and Joint Information Delete selected row? Test Package Completion Auditor Finisher Completion Date Completion Description Details of Corresponding Entrustment Order Details of Corresponding Entrustment Order Pipeline Number Weld Joint Number Welding Area Welding Method Search Weld Joint Pipeline Construction Area Pipeline Number Pipeline List Weld Joint Information Weld Joint Information Weld Joint Number Accept Weld Joint Specification Joint Type Inspection Ratio NDT Entrustment Order Audit NDT Entrustment Order Entry Month NDT Entrustment Order Entry Welding Daily Report Audit Cancel Audit Pipeline Weld Joint Equipment Weld Joint Entrustment Order Number Entrustment Unit Installation Name Entrustment Date Pressure NDT Ratio Entrustment Type Work No. Inspection Method Entruster Inspection Item Name Acceptance Grade Order Maker Bevel Type Inspection Criteria Welding Method Service Temperature Inspection Unit Required Inspection Date Auditor Audit Date Remarks Welding Daily Report Details Serial No. Pipeline Number Weld Joint Number Remarks Outer Diameter Wall Thickness Welding Area Welding Method Weld Joint Specification Records per page: NDT Entrustment Order Entry New Edit Delete Pipeline Equipment Corresponding Joint Order Non-Destructive Testing Commission Commission No. Commission Unit Commission Date NDT Ratio Commission Type Work No. NDT Method Commissioner Formulator Slope Type NDT Criteria Service Temperature Requested Inspection Date Corresponding Point Order Pipeline No. Joint No. Remarks Weld Area Welding Method Joint Specification Joint ID Search Welds Under Unit Pipeline Confirm deletion of selected rows? Weld Search Page Generate Commission Form Formulation Date Joint Management Device Area Select Display Columns Batch Add Batch Delete Print Report Joint Information Joint No. Is Welded Joint Status Extended Length Trust Status Wall Board No. NDT Rate NDT Type NDT Status Work Area Daily Report No. Component 1 Cover Welder Root Welder Component 2 Joint Specification Outer Diameter Nominal Diameter Wall Thickness Actual Wall Thickness Groove Type Weld Type Weld Wire No. Weld Rod No. Welding Location Completed Din Preheat Temperature Joint Attribute Interlayer Temperature Post-Weld Temperature Heat Batch No. 1 Heat Batch No. 2 Point Date Point Report No. Trust Code Trust Date External Inspection Result External Inspection Date External Inspector Is Heat Treatment Belonging Pipe Section Welding Current Welding Voltage Heat Treatment Date Heat Treatment Report No. Remarks Rows per page: Joint Information Maintenance Batch Add Joint Export Pipeline Joint Information Select Display Columns Print QR Code Delete selected rows? Batch Add Joint Joint No. To Joint No. Work Area Weld Type Joint Attribute Weld Wire Weld Rod NDT Rate NDT Type Wall Board No. Pre-Manufacturing Installation Active Fixed No Yes Joint Information Edit Close Material 1 Material 2 Component 1 Component 2 Weld Type Groove Type Interlayer Temperature Preheat Temperature Welding Method Weld Wire Weld Rod Joint Status Trust Flag Inspection Flag Material Type Inspection Rate Inspection Type Pipeline Primary Key Area Information Primary Key Area ID Joint Number Wall Board WLO Code Belonging Pipe Joint Description Heart No. 1 Heart No. 2 Size Diameter Extend Length Sch Actual Sch Last Temperature Joint Attribute IS_Proess Remark Report Code Floor Welder Cell Welder Done Diameter Welding Gas Protection Welding Speed Actual Preheat Temperature Component Number Material 1 Material 2 Report Date Floor Welder Name Cell Welder Name Not Welded Welded Not Punched Punched Save Copy Please select Material 1! Please select Weld Type! Please select Groove Type! Please select Welding Method! Please select Inspection Rate! Save successful! Copy successful! Copy failed! Pipeline Joint Information Export to Excel Sequence Number Pipeline Code Joint Code Is Welded Joint Status Trust Situation Inspection Situation Construction Area Welding Date Daily Report Number Material Component 1 Cover Welder Base Welder Component 2 Joint Specification Outer Diameter Inner Diameter Wall Thickness Actual Wall Thickness Groove Type Weld Type Welding Method Weld Wire Code Weld Rod Code Welding Area Completed Din Preheat Temperature Joint Attribute Interlayer Temperature Post Weld Temperature Heat Batch Number 1 Heat Batch Number 2 Punch Date Punch Report Number Trust Number Trust Date Outside Inspection Result Outside Inspection Date Outside Inspector Is Heat Treatment Belonging Pipe Section Welding Current Welding Voltage Heat Treatment Date Heat Treatment Report Number Remark Records per page: All Rows Joint Display Column Selection Save Select All Display Columns: Pipeline Management Pipeline Information Pipeline Information Pipeline Information Area Pipeline Code Is Non-Standard Medium Inspection Type Single Line Number Material Specification Search Select Display Columns Add Batch Delete Batch delete pipelines under current conditions Batch QR Codes Batch generate QR codes Sequence Number Pipeline Code Total DIN Total Joint Count Unit Medium Is Standard Inspection Rate Inspection Type Construction Area Single Line Number Material Quality Grade Pipeline Grade Records per page: All Rows Edit Export Joint QR Codes Delete Delete selected rows? Edit Pipeline Information Pipeline Code Unit Medium Is Non-Standard Inspection Rate Inspection Type Construction Area System Number Sub-System Number Work Package Number Single Line Number Drawing Revision Page Count Total Pipe Segments Paint Category Insulation Category Material Execution Standard Specification Modifier Modify Date Creator Create Date Design Pressure Design Temperature Test Pressure Test Temperature Quality Grade Penetrant Ratio Penetrant Grade Is Pickling Is Polishing Pipe Grade Inspection Report Number Pipe Length Remark Save Close Pipeline Display Column Selection Save Select All Display Columns: Point Management Point Management Point Order Node Tree By Month By Code Enter search condition Add Search Delete Confirm to delete this point order? Save Commission Print Point ID Unit Installation Point Date Creator Create Date Remark Serial Number Construction Area Pipeline Code Joint Number Top Layer Welder Bottom Layer Welder Search Pipeline and Joints Generate Commission Order Print Delete Delete selected row? Search Pipeline and Joints for Point Management Top Panel Left Panel Center Panel Pipeline Construction Area Pipeline Code Inspection Rate Search Confirm Number of Points Ratio Fixed Joint Fixed Joint Ratio Movable Joint Movable Joint Ratio Joint Number Joints Welders without Points Serial Number Joint Code Pipe Diameter Pipeline Code Welding Date Welder Code Weld Type Inspection Rate Welder Code Welder Name Procedure Image List Procedure Images Add Serial Number Image Summary Welding Method Thickness Weld Type Groove Type Procedure Image Management Edit Delete Delete selected row? Records per page: Edit Procedure Image Image Name Welding Method Thickness Weld Type Groove Type Attachment Upload Save Close Popup Window Welding Procedure Evaluation Search Welding Procedure Evaluation Search ID Type Material Specification (mm) Welding Material Thickness Range Pipe Outer Diameter Φmm Specimen Joint Form Specimen Wall Thickness (mm) Welding Method Weld Position Code Pre-weld Preheating (°C) Post-weld Heat Treatment Search Add Serial Number Welding Procedure Evaluation Code Material Type Material Category Material Group Remarks Welding Procedure Evaluation Edit Delete Delete selected row? Pre-Welding Procedure Specification Records per page: Edit Welding Procedure Evaluation Search ID Type Material Specification (mm) Welding Material Thickness Range Material Category Material Group Pipe Outer Diameter Φmm Specimen Joint Form Specimen Wall Thickness (mm) Welding Method Weld Position Code Pre-weld Preheating (°C) Post-weld Heat Treatment Remarks Save Close Daily Welding Report Month Daily Welding Report New Edit Delete Delete selected record? Import Print Daily Report No. Unit Installation Prepared By Preparation Date Welding Date Remarks Daily Welding Report Details Serial Number Work Area Pipeline Code Joint Code Inspection Ratio Capping Welder Root Pass Welder Welding Area Joint Attribute Weld Location Actual Diameter Completed DIN Current (A) Voltage (V) Welding Speed Preheat Temperature Actual Preheat Temperature Interpass Temperature Post-weld Heat Treatment Temperature Popup Window Print Records per page: Import Daily Welding Report Construction Area Number of Weld Joints in Area Data File Please upload an Excel file Audit Import Download Template Import Daily Welding Report Data Serial Number Error Row Number Error Column Error Type Daily Welding Report Unit Installation Prepared By Preparation Date Welding Date Remarks Save Delete Data Confirm delete selected row(s)? Find Joints Under Unit Pipeline Serial Number Work Area Pipeline Code Joint Code Inspection Ratio Capping Welder* Root Pass Welder* Welding Area* Joint Attribute* Weld Location* Actual Diameter Completed DIN Current (A) Voltage (V) Welding Speed Preheat Temperature Actual Preheat Temperature Interpass Temperature Post-weld Heat Treatment Temperature Joint Search Page Delete Search Weld Joint Construction Area Pipeline Code Pipeline List Capping Welder Root Pass Welder Joint Number Confirm Weld Joint Information Joint Number Material 1 Material 2 Specification Comprehensive Inspection Report Unit Name Construction Area Pipeline Code Export Comprehensive Inspection Report Serial Number Unit Code Unit Name Construction Area Pipeline Code Inspection Ratio Total Weld Joints Completed Total Weld Joints Commissioned Joints Extended Penetration Joints Inspected Joints Repaired Joints Removed Joints Records per page: Pipeline Comprehensive Analysis Unit Name Construction Area Material Pipeline Code Statistics Export Pipeline Comprehensive Analysis Serial Number Unit Code Unit Name Work Area Code Pipeline Code Latest Welding Date Total Weld Joints Total Prefabricated Weld Joints Total Installed Weld Joints Completed Weld Joints Completed Prefabricated Weld Joints Completed Installed Weld Joints Cut Weld Joints Completion Rate Prefabricated Completion Rate Installed Completion Rate Total DIN Total Prefabricated DIN Total Installed DIN Completed Total DIN Completed Prefabricated DIN Completed Installed DIN DIN Completion Rate Prefabricated DIN Completion Rate Installed DIN Completion Rate Total Film Count Passed Film Count Pass Rate Total Extended Penetration Films Passed Extended Penetration Films Extended Penetration Pass Rate Total Spot Films Passed Spot Films Spot Pass Rate Total Cut Films Passed Cut Films Extended Penetration Joints Spot Joints Commissioned Joints Inspected Joints Repaired Joints Inspection Ratio Commissioned Ratio Inspected Ratio Fixed Joint Inspection Ratio Records per page: Pipeline Comprehensive Information Construction Area Pipeline Code Non-standard? No Yes Export Pipeline Comprehensive Information Serial Number Unit Name Construction Area Pipeline Code Total DIN Weld Joint Count Medium Inspection Ratio Inspection Type Qualified Level Material Type Design Pressure Design Temperature Test Pressure Test Temperature System Number Sub-system Number Work Package Number Single Line Drawing Number Requires Heat Treatment? Pressure Test Package Number Pressure Test Date Records per page: Weld Joint Comprehensive Information Construction Area Weld Joint Specification Pipeline Code Export Weld Joint Comprehensive Information Serial Number Construction Area Pipeline Code Pipe Section Weld Joint Number Outer Diameter Wall Thickness Actual Wall Thickness Material Type Capping Welder Root Pass Welder Welding Method Inspection Ratio Medium Welding Date Daily Report Number Commissioned Code Requires Heat Treatment? Heat Treatment Commission Number Inspection Date Size Electrode Grade Electrode Name Wire Grade Wire Name Specification Spot Weld? Hardness Test Commission Number Hardness Test Commission Date Records per page: Medium Comprehensive Analysis Unit Name Construction Area Medium Export Medium Comprehensive Analysis Serial Number Unit Code Unit Name Construction Area Medium Code Medium Name Total Weld Joints Prefabricated Weld Joints Installed Weld Joints Completed Weld Joints Prefabricated Completed Weld Joints Installed Completed Weld Joints Cut Weld Joints Completion Rate Prefabricated Completion Rate Installed Completion Rate Total DIN Prefabricated Total DIN Installed Total DIN Completed Total DIN Prefabricated Completed Total DIN Installed Completed Total DIN DIN Completion Rate Prefabricated DIN Completion Rate Installed DIN Completion Rate Total Film Count Passed Film Count Pass Rate Total Extended Penetration Films Passed Extended Penetration Films Extended Penetration Pass Rate Total Spot Films Passed Spot Films Spot Pass Rate Total Cut Films Passed Cut Films Commissioned Joints Commissioned Extended Penetration Joints Commissioned Spot Joints Inspected Joints Repaired Joints Records per page: Non-Destructive Testing Monthly Report Month Search Save Non-Destructive Testing Monthly Report Serial Number Project Name Statistical Date Print Delete Delete selected row? Non-Destructive Testing Weekly Report Start Date End Date Search Save Non-Destructive Testing Weekly Report Serial Number Project Name Statistical Date Print Delete Delete selected row? Daily Quality Analysis by Unit and Work Area Unit Name Date Export Daily Quality Analysis by Unit and Work Area Serial Number Construction Unit Unit Code Total Inch-Feet Cumulative Completion Remaining Workload Completion Percentage Records per page: NDT Weekly Report Start Date End Date Unit Name Search Print Supervision Unit: Contract Unit: Construction Unit: Construction Progress Overview Sequence Number Work Content Unit Number Total Quantity Current Month Completion Cumulative Completion Cumulative Completion Rate% Welders Working Days in Current Month Remarks Welding Qualification Rate Overview (Pipeline) Welding Qualification Rate Overview (Equipment) Welder Qualification Rate Overview (Pipeline) Welder Qualification Rate Overview (Equipment) Unit Name Unit Number Total Films (Current) Pass Films (Current) Pass Rate (Current)% Total Films Pass Films Pass Rate% Welder Name Welder Number NDT Weekly Report Start Date End Date Unit Name Search Print Supervision Unit: Contract Unit: Construction Unit: Construction Progress Overview Sequence Number Work Content Unit Number Total Quantity Current Week Completion Cumulative Completion Cumulative Completion Rate% Welders Working Days in Current Week Remarks Welding Qualification Rate Overview (Pipeline) Welding Qualification Rate Overview (Equipment) Welder Qualification Rate Overview (Pipeline) Welder Qualification Rate Overview (Equipment) Unit Name Unit Number Total Films (Current) Pass Films (Current) Pass Rate (Current)% Total Films Pass Films Pass Rate% Welder Name Welder Number Prefabricated Installation Progress Unit Name Work Area Material Export Sequence Number Unit Code Unit Name Work Area Material Code Material Name Pipeline Number Max Size Total Din Finished Total Din Finished Rate Din% Total Sdin Finished Total Sdin Finished Rate Sdin% Total Fdin Finished Total Fdin Finished Rate Fdin% Records per page: Weld Joint Display Columns Save Select All Select Trust Check Data Overview Export Unit Name Work Area Sequence Number Unit Code Unit Name Device Name Work Area Audited Trust Orders Unaudited Trust Orders Audited Check Orders Unaudited Check Orders Records per page: Unit Work Area Progress Analysis Export Select Columns Unit Name Installation Work Area Start Date End Date Is Non-Standard Sequence Number Total Weld Joints Total Prefabricated Weld Joints Total Installed Weld Joints Cut Weld Joints Total DIN Total Prefabricated DIN Total Installed DIN Current Finished Weld Joints Current Finished Prefabricated Weld Joints Current Finished Installed Weld Joints Current Completion Rate Current Prefabricated Completion Rate Current Installed Completion Rate Current Finished DIN Current Finished Prefabricated DIN Current Finished Installed DIN Current DIN Completion Rate Current Prefabricated DIN Completion Rate Current Installed DIN Completion Rate Completed Weld Joints Completed Prefabricated Weld Joints Completed Installed Weld Joints Completion Rate Installed Completion Rate Prefabricated Completion Rate Completed DIN Completed Prefabricated DIN Completed Installed DIN DIN Completion Rate Prefabricated DIN Completion Rate Installed DIN Completion Rate Records per page: Unit Work Area Quality Analysis Export Select Columns Unit Name Installation Work Area Steel Type Start Date End Date Non-standard? Sequence Number Total Weld Joints Prefabricated Total Weld Joints Installed Total Weld Joints Completed Total Weld Joints Completed Prefabricated Total Weld Joints Completed Installed Total Weld Joints Current Total Films Current Pass Films Current Pass Rate% Current Point Total Films Current Point Pass Films Current Point Pass Rate% Current Extended Total Films Current Extended Pass Films Current Extended Pass Rate% Current Total Trust Orders Current Total Check Orders Total Films Pass Films Pass Rate% Point Total Films Point Pass Films Point Pass Rate% Extended Total Films Extended Pass Films Extended Pass Rate% Total Trust Orders Point Total Weld Joints Extended Total Weld Joints Total Repair Weld Joints Total Check Orders Records per page: Welder Performance Analysis Export Start Date End Date Unit Name Work Area Mother Material Type Team Group Welder Sequence Number Welder Code Welder Name Gender Current Total DIN Current Total Joints Current Total Repair Joints Current Repair Rate% Current Completion Rate% Current Film Joints Current Pass Film Joints Current Pass Rate% Current Total Films Current Pass Films Current Fail Films Current Pass Rate (Films)% Current Fail Rate (Films)% Total DIN Total Joints Total Repair Joints Repair Rate% Completion Rate% Total Films Pass Films Fail Films Pass Rate% Fail Rate% Team Group Name On Guard Status Records per page: Employee Information Status Responsible Unit Proposer Question Type Professional Recipient Acceptor Required Completion Time To Query New Import Serial Number ID Proposal Date Required Completion Date Closure Date Question Type Recipient Matter Description Acceptor Proposer Responsible Unit Professional Attachment Records per page: Key Matters Import Employee Information Edit Closed Open In Progress Key Matters Statistics Responsible Unit Proposer Recipient Question Type Professional Acceptor Query Serial Number Total Count Closed Count Open Count Processing Count Records per page: Key Matters Statistics Edit Please select one Key Matters Statistics Employee Information Status Responsible Unit Proposer Question Type Professional Recipient Acceptor Required Completion Time To Query New Import Serial Number ID Proposal Date Required Completion Date Closure Date Question Type Recipient Matter Description Acceptor Proposer Responsible Unit Professional Attachment Records per page: Key Matters Import Employee Information Edit Closed Open In Progress Employee Information Edit Employee ID Responsible Unit Professional Proposer Proposal Date Question Type Acceptor Required Completion Date Recipient Status Requires Multiple People Matter Description Key Matters Progress Progress Responsible Person Date Progress Details Upload Attachment Next Process Is Closed Recipient Submit Save Close Popup Window Open In Progress Closed Yes No Please select one Project-Level Construction Log Compiler Compile Date New Serial Number Compile Date Compiler Records per page: Project-Level Construction Log Modify View Delete Are you sure you want to delete the current data? Project-Level Construction Log Weather Condition Minimum Temperature (℃) Maximum Temperature (℃) Compile Date Main Work Summary Main Problems and Handling Measures Remarks Attachment Upload and View Attachments Save Popup Window Project-Level Construction Log View Weather Condition Minimum Temperature (℃) Maximum Temperature (℃) Compile Date Main Work Summary Main Problems and Handling Measures Remarks Attachment Upload and View Attachments Popup Window General Contractor Construction Plan Code Compile Date Compiler Approval Status Auditor New Serial Number File Code Records per page: General Contractor Construction Plan Modify View Delete Are you sure you want to delete the current data? General Contractor Construction Plan Edit File Code Compile Date File Content Approval Process Settings for General Contractor Construction Plan Do you agree? Agree Disagree Handling Steps Handler My Opinions Approval List for General Contractor Construction Plan Type of Approval Approver Date of Approval Approval Opinion Attachment Upload and View Attachments Download Template Save Submit Popup Window General Contractor Construction Plan View File Code Compile Date File Content Approval List for General Contractor Construction Plan Type of Approval Approver Date of Approval Approval Opinion Attachment Upload and View Attachments Popup Window General Contractor Construction Report Code File Type Compile Date Compiler Approval Status Auditor New Serial Number File Code Records per page: General Contractor Construction Report Modify View Delete Are you sure you want to delete the current data? General Contractor Construction Report Edit File Code File Type Compile Date File Content Approval Process Settings for General Contractor Construction Report Do you agree? Agree Disagree Handling Steps Handler My Opinions Approval List for General Contractor Construction Report Type of Approval Approver Date of Approval Approval Opinion Attachment Upload and View Attachments Download Template Save Submit Popup Window General Contractor Construction Report View File Code File Type Compile Date File Content Approval List for General Contractor Construction Report Type of Approval Approver Date of Approval Approval Opinion Attachment Upload and View Attachments Popup Window Project Pictures Project Please select from the dropdown table Name Code Status In Construction Paused/Completed Title New Export Serial Number Code Title Category Upload Date Status Attachment Project Pictures Attachment Edit Delete Delete selected row? Records per page: Edit Project Picture Code Title Picture Attachment Upload and View Attachments Brief Description Picture Category Upload Date Compiler Save Submit Close Popup Window View Project Picture Code Picture Title Picture Upload and View Upload and View Attachments Brief Description Picture Category Upload Date Compiler Close Popup Window General Incoming Document Management Project Document Company Incoming Document Code Name New Export Incoming Document Code Document Name Incoming Unit Date Received Status Attachment General Incoming Document Management Attachment Page Edit Issue Delete Delete selected row? Records per page: Edit General Incoming Document Management File Type Project Document Company Incoming Document Incoming Document Code Document Name Date Received Original Document Code Original Page Number Version Number Sender Incoming Unit Receiving Units Select All Select None Document Content Attachment Upload and View Attachments Response Save Submit Close Popup Window General Incoming Document Management File Type Project Document Company Incoming Document Incoming Document Code Document Name Date Received Original Document Code Original Page Number Version Number Sender Incoming Unit Receiving Units Document Content Attachment Upload and View Attachments Response Close Popup Window Work Handover New Transfer Date Transfer Person Receiver Approval Status Processor Records per page: Work Handover Edit View Delete Confirm delete current data? Edit Work Handover Transfer Person Transfer Person Department Receiver Receiver Department Transfer Position Transfer Date Transfer Content List Add Serial Number Transfer Content Quantity Attachment Delete Work Handover Approval Flow Settings Do you agree? Agree Disagree Processing Step Processor My Opinion Work Handover Approval List Approval Type Approver Approval Date Approval Idea Save Submit Close Popup Window View Work Handover Transfer Person Transfer Person Department Receiver Receiver Department Transfer Position Transfer Date Transfer Content List Serial Number Transfer Content Quantity Attachment Work Handover Approval List Approval Type Approver Approval Date Approval Idea Popup Window Construction General Layout Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Code Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Construction General Layout Name Code Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Project Map Project Please select from the dropdown list Name Code Status In Construction Paused/Completed Serial Number Title Enter search criteria New Export Category Upload Date Compiler Brief Description Attachment Records per page: Project Map Attachment Edit Delete Delete selected row? Edit Project Map Category Title Map Attachment Attachment Upload and View Brief Description Upload Date Compiler Save Close Popup Window General Layout Map Area Layout Map 3D Model Map View Project Map Category Image Title Image Upload and View Attachment Upload and View Brief Description Upload Date Compiler Close Popup Window Mobile Home Page New Export Serial Number Date Safety Man-Hours On-Site Personnel Count Large and Special Equipment Cumulative Entry Training Count Total Hidden Danger Rectification Orders Rectified Hidden Danger Orders Risk Level I Count Risk Level II Count Risk Level III Count Risk Level IV Count Risk Level V Count Records per page: Edit Project Information Edit Delete selected row? Safety Man-Hours On-Site Personnel Count Large and Special Equipment Cumulative Entry Training Count Total Hidden Danger Rectification Orders Rectified Hidden Danger Orders Risk Level I Count Risk Level II Count Risk Level III Count Risk Level IV Count Risk Level V Count Save Close Heavy Lifting Planning Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Heavy Lifting Planning Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Subcontract Planning Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Subcontract Planning Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Company/Department Construction Management Regulations Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Company/Department Construction Management Regulations Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Temporary Facilities Planning Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Temporary Facilities Planning Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Human Resources Mobilization Planning Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Human Resources Mobilization Planning Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Analysis and Handling of Key and Difficult Points in Construction Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Analysis and Handling of Key and Difficult Points in Construction Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Project Construction Management Regulations Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Project Construction Management Regulations Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Edit Project Construction Management Regulations Name Preparer Upload Date Remark Attachment Upload Upload Attachment Save Close Popup Window Start Work Report Search by Name Search Add Edit Delete Are you sure you want to delete this data? Serial Number Code Name Preparer Upload Date Remark Attachment View Records per page: Page Edit Building Engineering Installation Engineering Please select a unit engineering node to expand! You do not have this permission, please contact the administrator! Please select a tree node! Unit Work Package Qualified Unqualified Not Required Construction Progress Earned Value Curve Unit Engineering Category Unit Engineering Measure Progress by Entity Qualification Measure Progress by Data Qualification Statistics Method Month Week Day Start Date End Date Query Earned Value Curve Unit Month Planned Value Cumulative Planned Value Completed Value Cumulative Completed Value Actual Cost Cumulative Actual Cost Plan Adjustment and Bias Correction Settings Bias Correction Type Items Device/Unit: Profession: Query Unit Engineering Sub-Unit Engineering Subdivision Engineering Sub-Subdivision Engineering Subitem Engineering Sub-Subitem Engineering Device Full Profession All Unit Engineering Progress Measurement Summary Table Measurement Mark (Weights) Percentage Cost (Yuan) Completed Value (Yuan) (BCWP) Monthly Cost Cumulative Cost Cumulative % Actual Cost (Yuan) (ACWP) Monthly Actual Cost Cumulative Actual Cost Earned Value (EV) Progress (SV) Cost (Yuan) Cost (CV) Progress Plan Start Date End Date Planned Value (Yuan) (BCWS) Monthly Plan Cumulative Plan Monthly Plan % Cumulative Plan % Is Leaf Node Correction Measures Please select correction measures: Reminder cycle every days Save Data Company/Department Progress Management Provisions Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Project Progress Management Provisions Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window EPC Plan Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Construction Master Schedule Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Monthly Construction Schedule Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Weekly Construction Schedule Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Preparation of Construction Master Schedule Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Monthly Construction Report Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Preparation of Construction Master Schedule Search by Name Add Edit Delete Are you sure you want to delete the data? Name Compiler Upload Date Remark Attachment View Attach Download Records per page: Page Edit Name Compiler Upload Date Remark Attachment Upload Attachment Upload Save Close Popup Window Import WBS Select File to Import Audit Save Download Template Export WBS WBS Information WBS Information Project Export to Excel Serial Number Code Name WBS Library Maintenance WBS Library Settings WBS Library Settings WBS Library Settings WBS Information Add Edit Delete Confirm delete selected item? Code Name Level Content Remark Type Records per page: Edit Add Unit, Subdivision, and Item Engineering Settings Unit, Subdivision, and Item Engineering Audit and Release Unit, Subdivision, and Item Engineering Settings Unit, Subdivision, and Item Engineering Settings WBS Information Save Export WBS Import Orange: Start and end dates are not within the start and end dates of the parent level or the start date is greater than the end date. Red: Not approved. Code Name Schedule Start Date Schedule End Date Type Level Cycle Frequency Content ID Select Records per page: Edit Copy Import/Export WBS Information Add Edit Copy Classify Delete Delete selected row? Audit Confirm to approve this item and its sub-items? Edit Unit, Subdivision, and Item Engineering Settings Code Name Schedule Start Date Schedule End Date Content Sort Index Construction Unit Remark Save Data Close Copy Unit, Subdivision, and Item Engineering Settings Code Name Schedule Start Date Schedule End Date Level Content Sort Index Remark Save Data Close Classified Copy of Unit, Subdivision, and Item Engineering Settings Code Name Schedule Start Date Schedule End Date Content Sort Index Remark Save Data Close Edit WBS Settings Code Name Content Weight Remark Save Data Close Actual Progress (Completion Value/Actual Cost) Measurement Entry Actual Progress (Completion Value) Measurement Entry Actual Progress (Completion Value) Measurement Entry Actual Progress (Completion Value) Measurement Entry Month Save Red: Items that have ended but are not yet completed, Gray: Items that have not started yet, Green: Previous cumulative completion value + current month's value equals total planned value Code Name Sub-division Code Sub-division Name Percentage (%) Cost (RMB 10k) Monthly Plan Cumulative Plan Engineering Quantity Monthly Completion Monthly Completion Rate (%) Cumulative Completion Cumulative (%) Monthly Actual Cost Cumulative Actual Cost Schedule Variance (SV) Cost Variance (CV) Start Date End Date Correct Completion Value Progress (Completion Value) Measurement Report Progress (Completion Value) Measurement Report Time: Facility/Unit: Specialty: Query Please select facility/unit: Please select specialty: Unit Project Sub-unit Project Subdivision Project Sub-subdivision Project Item Project Sub-item Project Summary of Progress Measurement for All Unit Projects in All Specialties Facility/Unit Proportion Cost (RMB) Monthly Cost Cumulative Cost Cumulative % Monthly Actual Cost Cumulative Actual Cost Schedule Variance (SV) Cost Variance (CV) Cost (RMB) Cost (RMB) Start Date End Date Monthly Plan Cumulative Plan Monthly Plan % Cumulative Plan % View Previous Versions Version Month Monthly Plan (RMB 10k) Cumulative Plan (RMB 10k) Cumulative (%) Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Save Save All View Previous Versions Month Monthly Plan (RMB) Cumulative Plan (RMB) Cumulative (%) Recalculate Total Are you sure you want to recalculate the planned values? Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Schedule Plan and Planned Value Settings Save View Previous Versions Month Monthly Plan (RMB 10k) Cumulative Plan (RMB 10k) Cumulative (%) Total Planned Value Schedule Measurement Mark (Weight) Settings Schedule Measurement Mark (Weight) Settings Schedule Measurement Mark (Weight) Settings Set Engineering Quantity Set Weights Save Save Calculate Installation Weights Calculate the weight ratio of each level within the installation based on the set workload. Code Name Engineering Quantity Unit Budget Unit Price Cost Unit Price Percentage (%) Cost (RMB 10k) Start Date End Date Records per page: Edit Cancel Audit Are you sure you want to cancel the audit for the selected row? Home Page Security Statistics Safe Work Hours Safety Inspection Total (units) Closed Loop (units) Not Closed Loop (units) Warning Information Qualification Warning Certificate Warning Mechanical Warning Quality Control Warning Output Statistics Project Overview Project Name: Project Location: Project Cost: Construction Unit: Contractor: Supervision Unit: Contract Total Duration Days Contract End Date Days Remaining Until Completion Quality Statistics Total Issues Issues Completed Issues Not Completed Remediation Rate Qualification Rate Welding First Pass Rate Project Progress Plan No Overdue Foundation Construction Structural Construction Main Construction Interior Decoration Electromechanical Engineering Acceptance Completion Labor Data (Cumulative) Current On-site Personnel Total Workers Total Managers Video Monitoring Real-time Line: Line 1 Environmental Monitoring °C Sunny to Cloudy SmartProgress Code Delete Hardness Commission Save Hardness Commission Delete Repair Commission Save Repair Commission Repair Commission Pipeline Weld Joint Import Data File Please upload an Excel file Upload File Upload Update Import Save Review and Save Refresh Delete Duplicate Weld Joints Delete duplicate pipeline weld joints in the temporary table? Delete Records Delete all temporary import records for the current user? Export Template Download Import Instructions Data Import Serial Number Row Number Unit Code Work Area Number Pipeline Code Weld Joint Code Material Type Code Material 1 Code Material 2 Code Material 1 Material 2 NDT Ratio Code Weld Type Code Welding Area Weld Joint Attribute Dyne Factor Specification Wall Thickness Welding Method Code Test Pressure Weld Rod Code Weld Wire Code Medium Code Single Line Drawing Number Design Pressure Design Temperature Bevel Code Pipeline Grade Code Component 1 Code Component 2 Code Furnace Batch Number 1 Furnace Batch Number 2 Pipe Segment Preheat Temperature Heat Treatment Required Heat Treatment Number Welding Position Outside Diameter Hardness Test Ratio (Numeric) Welding Gas Protection Component Quantity